Signs a roof is due for replacement
- Shingles are curling, cracking or have lost most of their granules
- Granules are piling up in the gutters and at the downspouts
- Leaks have appeared in more than one part of the house
- The roof deck sags or feels soft underfoot
- The roof is 20 years old or more and has already been patched several times
What a replacement involves
- Tear-off. The old shingles and underlayment come off so the wood deck can be seen.
- Deck repair. Rotted or delaminated sheathing is replaced. This is the most common source of extra cost, so ask how it will be priced.
- Underlayment and flashing. New underlayment, drip edge and flashing go on, with a waterproof membrane in valleys and other leak-prone areas.
- Roofing. New shingles or metal panels, ridge caps and vents are installed.
- Clean-up. Debris is hauled away and the yard is swept with a magnet for nails.
Most single-family shingle roofs take one to three days once work begins, weather permitting.
What it costs
Nationally, a roof replacement typically costs $7,500 to $14,000, with an average of about $10,000, according to Fixr's roof replacement cost guide. Those are national figures, not local quotes. Your price depends on the size and pitch of the roof, how many layers have to come off, the material you choose and how much decking needs replacing. The roof cost guide explains each factor.
Questions to ask before you sign
- Is the estimate written and itemised, including how decking repairs are priced?
- Will the old roof be torn off, or are you proposing to go over it?
- Who handles a permit if my city or county requires one?
- What warranty comes from the manufacturer, and what do you guarantee on workmanship?
- Can I see proof of liability insurance and workers' compensation cover?
- What is the payment schedule, and what is due before work starts?
Areas we cover
Common questions
Can new shingles go over the old ones?
Sometimes, but a tear-off is usually the better job. Going over old shingles hides the condition of the deck, adds weight and can shorten the life of the new roof. Ask the contractor what they recommend for your roof and why.
How long will the house be torn up?
Most single-family shingle roofs are finished in one to three days of work. Large or steep roofs, rotten decking and bad weather add time.
Should I get more than one estimate?
For a job this size, yes. We connect you with one local contractor, and you are free to get other prices. Compare the materials and what is included, not just the bottom line.